OBJECTIVE:
To lay down the procedure for Operation of Heating Mantle in Laboratory.
SCOPE:
This procedure is applicable for the Heating Mantle in Laboratory at Quality Control Laboratory.
RESPONSIBILITY:
Quality Control Officer / Executive is responsible to follow procedure as per the procedure mentioned in this SOP.
QC Head is responsible for implementation and compliance of the procedure as per this SOP.
ABBREVIATIONS
SOP : Standard Operating Procedure
PROCEDURE:
Ensure the working area is clean and free from dust.
Switch on the power supply.
A red indicator glows.
Adjust the knob to set the required temperature.
Keep the sample in a glass container on the heating mantle.
Remove the sample container from the heating mantle after heating/boiling is completed.
Set the temperature knob to zero and switch off the power supply.
Tags
QC SOP