OBJECTIVE:
To lay down the procedure for entry and exit procedure in Quality Control Department.
SCOPE:
This procedure is applicable for the personnel entering in the Quality Control.
RESPONSIBILITY:
All Quality Control Personnel.
ABBREVIATIONS
SOP : Standard Operating Procedure
SS : Stainless Steel
PROCEDURE:
Entry in Quality Control Department
Open the main door of the Quality control and enter into the first change room.
Sit on the SS bench provided in between the passage and take out the foot wear.
Place the footwear in the designated place.
Outside visitors can wear the shoes cover on the footwear & disposable apron.
Cross over the bench and wear the lab shoes/ Sleepers.
Take out the aprons kept in the Almirah and wear the apron and enter in the quality control department.
Exit From Quality Control Department
Keep the lab shoes/ Sleepers in the space provided within the SS bench.
Before leaving the Quality Control Department after the work / visit, remove the aprons and put in the Almirah.
Cross over the bench and wear the street footwear or remove the shoes cover and exit the lab.
Tags
QC SOP